Skip to main content

Wind Farm Substation Nears

As installation of the South Fork Wind farm’s monopile foundations nears, the first American-built offshore wind substation is making its way to the site. A ship carrying the substation set sail from Ingleside, Tex., on May 24. The 1,500-ton, 60-foot-tall substation will sit on a monopile foundation within the 12-turbine, 132-megawatt wind farm, collecting the power generated by the turbines and connecting it to the electrical grid.