PSEG Cables Beneath Long Pond Greenbelt?
On Tuesday, PSEG will present plans to install a five-mile-long underground transmission line between that substation and the Buell substation on Cove Hollow Road in East Hampton starting in 2024. For three to five months, during the proposed construction period, a portion of the Long Pond Greenbelt would be closed.